Project Detail
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
Capacity
16 m³/hour
Project Year
2016
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
16 m³/hour
2016
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Multimedia and active carbon filter group before RO
MBR
Ultrafiltration plant for water bottling plant
Drinking water production project from Libyan well water
Libyan well water production
Gray water recovery plant for residential