Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Well water treatment plant produced for a company in Turkey
Domestic water production facility in Europe
Drinking water production project for Greece
Drinking water production project from Kenya well water
Romanian process water production
Packed type batch sequential reactor wastewater treatment plant