Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Pre-treatment plant for a factory in Turkey
Barambo package SBR plant
Turkmenistan textile factory process water production
Astaldi drinking water RO plant
MBR wastewater treatment plants manufactured for Bamaco
Immersion Ceramic Ultrafiltration Plant