Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Drinking water production project from Libyan well water
MBR wastewater treatment plants manufactured for Bamaco
Containerized ultrafiltration plant for Central African Republic
Mains water treatment project for Nigeria
Multimedia and active carbon filter group before RO
Sewage treatment plant for Philippines