Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
You can contact us by using the form below for special solutions for your needs.
Well water treatment plant produced for a company in Turkey
Drinking water production project for Greece
Another reverse osmosis potable water production plant produced for a business partner in Mexico.
Food Industry process water production Türkiye
Pilot MBR wastewater treatment plant for Brazil
Turkmenistan textile factory process water production