Project Detail
Standard design, inside-out ultrafiltration plant.
Capacity
3 m³/hour
Project Year
2018
Standard design, inside-out ultrafiltration plant.
3 m³/hour
2018
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
UF+RO pilot plant project for textile wastewater treatment plant
Multimedia and active carbon filter group before RO
Ultrafiltration plant for water bottling plant
Wastewater Treatment Plant
drinking water plant in Nigeria
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.