Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Drinking water production project for Greece
Drinking water production plant for Oman
Pre-treatment plant for a factory in Turkey
Bursa ATT deionized water production facility
Drinking water production for villages in Jijiga, Ethiopia
20’DC In-Container RO System made for France