Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
UF+RO pilot plant project for textile wastewater treatment plant
Kahramanmaras Process Water Production
Pilot scale ceramic oil separator
Drinking water production project from Libyan well water
Astaldi drinking water RO plant
Address Yalıkavak Bodrum Turkey