Pre-Treatment Plant

Pre-treatment plant for a factory in Turkey
Ön Arıtma Tesisi

Project Detail

For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes

Capacity

3 m³/hour

Project Year

2021

Ücretsiz Teklif Alın

İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.

 

Diğer Projeler