Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Jordan River MBR
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.
Container-type drinking water production facility for a military hospital in Iraq
Ultrafiltration plant for water bottling plant
Factory waste water recovery facility with a capacity of 40m3/day, which we produced for a business partner in Nigeria.
Multimedia and active carbon filter group before RO