Project Detail
Reverse osmosis device with 3 m³/hour capacity for pre-treatment for our business partner operating in Bolu
Capacity
3 m³/hour
Project Year
2021
Reverse osmosis device with 3 m³/hour capacity for pre-treatment for our business partner operating in Bolu
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.
MBR plant for textile wastewater
Pilot ceramic UF plant
SBR Wastewater Treatment Plant
Turkmenistan textile factory process water production
Turkish Armed Forces Somalia Base, drinking water production facility from sea water