Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
You can contact us by using the form below for special solutions for your needs.
Turkmenistan package SBR plant
Packed type batch sequential reactor wastewater treatment plant
SBR Wastewater Treatment Plant
Pilot MBR wastewater treatment plant for Brazil
Barambo package SBR plant
METU Reverse Osmosis Facility