Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Mains water treatment project for Romania
UF plant for a marble factory in Belgium
Pilot MBR wastewater treatment plant for Brazil
Solar powered nanofiltration
Irak SBR
Mains water treatment project for Nigeria