Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Drinking water production project from Libyan well water
MBR
Pilot ceramic UF plant
Kahramanmaras Process Water Production
Domestic water production facility in Europe
Cube Line Reverse Osmosis Devices for Jordan