Project Detail
UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
Capacity
1 m³/saat
Project Year
2022
UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
1 m³/saat
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Barambo package SBR plant
MBR facility for Saudi Arabia
Turkmenistan textile factory process water production
Drinking water production project from Libyan well water
Gray water recovery plant for residential
Grey water recovery plant installed in a commercial center in Istanbul