Project Detail
UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
Capacity
1 m³/saat
Project Year
2022
UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
1 m³/saat
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Drinking water production project from Kenya well water
Cube Line Reverse Osmosis Devices for Jordan
Another reverse osmosis potable water production plant produced for a business partner in Mexico.
Turkish Armed Forces Somalia Base, drinking water production facility from sea water
Reverse osmosis plant for drinking water from well water in Somalia
MBR plant for textile wastewater