Project Detail
Rielli MBR system with ceramic membrane, produced with a capacity of 150 m³/day, operating in Turkey
Capacity
150 m³/day
Project Year
2022
Rielli MBR system with ceramic membrane, produced with a capacity of 150 m³/day, operating in Turkey
150 m³/day
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Domestic water production facility in Europe
Domestic water production facility we designed for a customer in Denmark.
Pilot MBR wastewater treatment plant for Brazil
Bursa ATT deionized water production facility
UF+RO pilot plant project for textile wastewater treatment plant
Astaldi drinking water RO plant