Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Address Yalıkavak Bodrum Turkey
Libyan well water production
Cretan RO devices
Pilot scale ceramic oil separator
MBR facility for Saudi Arabia