Project Detail
Rielli MBR system with ceramic membrane, produced with a capacity of 150 m³/day, operating in Turkey
Capacity
150 m³/day
Project Year
2022
Rielli MBR system with ceramic membrane, produced with a capacity of 150 m³/day, operating in Turkey
150 m³/day
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Mains water treatment project for Romania
Drinking water production project from Kenya well water
Grey water recovery plant installed in a commercial center in Istanbul
Well water treatment in Uzbekistan
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.
Multimedia and active carbon filter group before RO