Project Detail
Production facility of drinking and utility water from well water with high salinity.
Capacity
13 m³/ day
Project Year
2017
Production facility of drinking and utility water from well water with high salinity.
13 m³/ day
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
UF+RO pilot plant project for textile wastewater treatment plant
Drinking water production project from Kenya well water
Libyan well water production
Address Yalıkavak Bodrum Turkey
Barambo package SBR plant
Reverse osmosis potable water production plant produced for a business partner in Mexico.