Project Detail
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
Capacity
16 m³/hour
Project Year
2016
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
16 m³/hour
2016
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Pre-treatment plant for a factory in Turkey
Domestic water production facility in Europe
Ultrafiltration plant for our Greek customer
Astaldi drinking water RO plant
Cube Line Reverse Osmosis Devices for Jordan
MBR wastewater treatment plants manufactured for Bamaco