Project Detail
Reverse osmosis plant for the production of drinking water from well water with a capacity of 1.5 m³/hour for water stations established in rural areas in Kenya
Capacity
1,5 m³/hour
Project Year
2015
Reverse osmosis plant for the production of drinking water from well water with a capacity of 1.5 m³/hour for water stations established in rural areas in Kenya
1,5 m³/hour
2015
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
drinking water plant in Nigeria
Package type gray water treatment plant
Desalination plant for Iraq
Well water treatment project for Peru
MBR wastewater treatment plants manufactured for Bamaco
Demo Ultrafiltration Device