Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Reverse osmosis potable water production plant produced for a business partner in Mexico.
Turkmenistan textile factory process water production
Another reverse osmosis potable water production plant produced for a business partner in Mexico.
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.
Mains water treatment project for Nigeria
Factory waste water recovery facility with a capacity of 40m3/day, which we produced for a business partner in Nigeria.