Project Detail
Reverse osmosis facility for the production of deionized water with a capacity of 6 m³/hour for our business partner operating in Bursa
Capacity
6 m³/hour
Project Year
2018
Reverse osmosis facility for the production of deionized water with a capacity of 6 m³/hour for our business partner operating in Bursa
6 m³/hour
2018
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Mains water treatment project for Romania
Packed type batch sequential reactor wastewater treatment plant
Cretan RO devices
20’DC In-Container RO System made for France
Turkish Armed Forces Somalia Base, drinking water production facility from sea water
Drinking water production project from Libyan well water