Project Detail
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
Capacity
16 m³/hour
Project Year
2016
16 m³/h ultrafiltration plant to supply drinking water to the UN base in the Central African Republic.
16 m³/hour
2016
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
UF+RO pilot plant project for textile wastewater treatment plant
Pre-treatment plant for a factory in Turkey
Cube Line Reverse Osmosis Devices for Jordan
Domestic water production facility in Europe
Drinking water production for villages in Jijiga, Ethiopia
Gray water recovery plant for residential