Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
drinking water plant in Nigeria
Drinking water production project from Kenya well water
Drinking water production project for Greece
Pilot ceramic UF plant
Another reverse osmosis potable water production plant produced for a business partner in Mexico.