Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Ultrafiltration plant for water bottling plant
Drinking water production for villages in Jijiga, Ethiopia
Pilot scale ceramic oil separator
Barambo package SBR plant
MBR plant for textile wastewater
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.