For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Food Industry process water production Türkiye
Drinking water production project from Kenya well water
Bursa ATT deionized water production facility
MBR wastewater treatment plants manufactured for Bamaco
Turkmenistan package SBR plant
Greece MBR package wastewater treatment plant