Project Detail
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
Capacity
3 m³/hour
Project Year
2021
For our business partner operating in Adana, pre-treatment with a capacity of 33 m³/hour (sand + carbon filter) and ultrapure water system with a capacity of 3 m3/hour with two passes
3 m³/hour
2021
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Romanian process water production
MBR plant for textile wastewater
Mains water treatment project for Romania
Turkish Armed Forces Somalia Base, drinking water production facility from sea water
Pre-treatment plant for a factory in Turkey
Factory waste water recovery facility with a capacity of 50m3/day, which we produced for a business partner in Nigeria.