Project Detail
Production, installation and commissioning of reverse osmosis plants, each with a capacity of 21 m³/hour, for our business partner operating in Ethiopia
Capacity
21 m³/hour
Project Year
2017
Production, installation and commissioning of reverse osmosis plants, each with a capacity of 21 m³/hour, for our business partner operating in Ethiopia
21 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Ceramic Membrane MBR System designed for a Chemical Factory in Turkey
Irak SBR
Romanian process water production
Packed type batch sequential reactor wastewater treatment plant
Mains water treatment project for Nigeria
Greece MBR package wastewater treatment plant