Project Detail
UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
Capacity
1 m³/saat
Project Year
2022
															UF+RO pilot plant with 1 m³/hour working capacity to test the effluent of the textile wastewater treatment plant we produced for our business partner operating in Turkey
1 m³/saat
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Ceramic Membrane MBR System designed for a Chemical Factory in Turkey
Packed type batch sequential reactor wastewater treatment plant
Pilot ceramic UF plant
Immersion Ceramic Ultrafiltration Plant
Turkmenistan textile factory process water production
Mains water treatment project for Nigeria