Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Pre-treatment plant for a factory in Turkey
Domestic water production facility in Europe
Turkmenistan package SBR plant
MBR
Barambo package SBR plant
MBR wastewater treatment plants manufactured for Bamaco