Project Detail
Production, installation and commissioning of reverse osmosis plants, each with a capacity of 21 m³/hour, for our business partner operating in Ethiopia
Capacity
21 m³/hour
Project Year
2017
Production, installation and commissioning of reverse osmosis plants, each with a capacity of 21 m³/hour, for our business partner operating in Ethiopia
21 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Desalination plant for Iraq
Libyan well water production
Well water treatment in Uzbekistan
20’DC In-Container RO System made for France
METU Reverse Osmosis Facility
UF+RO pilot plant project for textile wastewater treatment plant