Project Detail
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
Capacity
10 m³/hour
Project Year
2017
Production, turnkey installation and commissioning of a seawater RO plant with a capacity of 10 m3/hour.
10 m³/hour
2017
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Ceramic Membrane MBR System designed for a Chemical Factory in Turkey
Romanian process water production
Drinking water production for villages in Jijiga, Ethiopia
Domestic water production facility in Europe
Turkish Armed Forces Somalia Base, drinking water production facility from sea water
Drinking water production project from Kenya well water