Project Detail
It is designed and manufactured to recycle the factory wastewater of a Nigerian customer.
Capacity
50 m³/day
Project Year
2022
It is designed and manufactured to recycle the factory wastewater of a Nigerian customer.
50 m³/day
2022
İhtiyacınıza özel çözümler için aşağıdaki formu kullanarak bize ulaşabilirsiniz.
Astaldi drinking water RO plant
20’DC In-Container RO System made for France
Well water treatment in Uzbekistan
Pilot ceramic UF plant
Packed type batch sequential reactor wastewater treatment plant
Irak SBR